How much does mobile app development cost? The cost to develop a mobile app will vary significantly based on how robust the final product needs to be. It depends on how elaborate the desired features and design are, who develops the product, and how long it takes. Let's break down the up-to-date mobile app development costs and what affects them.

The world is going mobile at an incredibly fast pace. We've all been witnessing this digital transformation and expect high-quality mobile solutions, regardless of whether we're shopping online or paying our bills using a smartphone.

Undoubtedly, the demand for high-quality mobile apps has increased. And the same is seen with the need to find reliable partners who deliver decent mobile application development services within adequate timeframes and at a fair price. But how much does it cost to build an app? And what can be considered a "fair price"?

On this page, we'll go over the costs of making an app and explain what influences them. Plus, we'll provide a sample timeline showing how we estimate such projects. Let's roll!

Average Mobile App Development Cost

The global application development market size is on the rise as more and more companies are investing in mobile applications. Recent statistics show that the worldwide revenue in this software development sector is expected to exceed 218 billion USD already in 2027.

Global Application Development Software Market Size

But what does this mean for those who want to build an application? And how much does it cost to develop an app on average? Giving a very approximate cost, we'd say that the price for building an application can fall somewhere between $40,000 and $300,000 USD.

This may seem like quite a large rift in the average cost of app development, but the truth is it really depends. No two app products are the same, and the overall cost can vary based on multiple factors. Primarily, a lot is determined by the complexity of the application, i.e.:

  • the number of features;
  • how hard the chosen functionality is to develop;
  • how intricate the design is;
  • the approach you take when building the app from a technical perspective;
  • how many plugins and integrations are required;
  • how quickly you want to hit the market;
  • among others.

In general, a simple MVP-type application that takes 1 to 3 months to create can cost around $30,000 - $70,000 USD, while a more intricate solution that takes 3 to 6 months can cost about $70,000 - $180,000 USD. And if we're talking about a very complex app that'll require 9 or more months of development, then the cost can go as high as $300,000 USD and up.

Let's go over what can influence app development costs in more detail.

What Affects Mobile App Cost?

If you think about it, making mobile applications can be compared to cooking dishes. Although in this case all apps can be categorized as "food", their recipes, ingredients, and ways to prepare and serve them are very versatile. So, just as with dishes, some mobile applications can cost you a lot more than others. Here are some things that can impact the price.

Factors influencing the mobile app development cost

The Type of Application

Falling back on the previous analogy, are you cooking a starter or a main course dish? There are various types of mobile applications that you can create, including:

  • native apps;
  • hybrid applications;
  • progressive web apps.

As such, you might want a native application, which requires a platform-specific codebase, APIs, and features. This means the app will be coded separately for iOS, Android, or other platforms and hence needs more time for testing and optimization, all adding to the cost. 

Obviously, developing a native app will take longer and can cost more than if you'd build an app on a single codebase or choose a hybrid solution that uses cross-platform app development instead.

To compare, average standalone Android app cost can start from $50,000 USD, a standalone iOS application may cost you $75,000 USD and up, while a hybrid app for multiple platforms at once can cost about $60,000 - $80,000 USD.

The Used Technology

The "cooking method" (or selected tech stack and platform) can also influence the overall app creation cost. Are you going to go for low-code tools or traditional development? Are you planning to use rare programming languages or popular mobile app development frameworks?

Certainly, the cost of some technologies may be higher than others. Plus, a lot depends on the global demand and availability of specialists in a given sphere.

Even in the case of hybrid app development, there are multiple alternatives. If you're unsure which mobile technology path to follow (say, you don't know whether you should settle on Flutter or React Native), turning to a third-party vendor can be a good alternative. You'll get advice on the optimal option for your case. 

The Chosen Industry

Once again, if we compare mobile apps to dishes, are you planning a homemade meal or serving some luxury Michelin haute cuisine? Surely, the industry can also impact the cost for mobile app development.

For instance, travel app development pricing may differ from creating a SaaS platform, making a fitness app, game, an educational app, an e-commerce store app, or a fintech app. These solutions have various end users, aims, and use cases, so it's no surprise that the timeframes and approaches to building them will differ too.

The bottom line is that it all goes down to the peculiarities of the specific niche and the industry standards that apply. I.e., a game might require more time for design, while a fintech solution can have much stricter security and compliance requirements.

How Complex the App Is

And yet again, is your mobile app a simple cheesecake or a fancy three-tier wedding cake? The answer to "how much does an app cost" is primarily based on the app's complexity.

How many features will it have? Are you starting with building an MVP for the app with a minimal feature set, or are you planning to release lots of advanced and complicated features straight away?

The more tangled your functionality, business logic, and features are, the higher the price. Obviously, the faster you want the app to go live, the more workforce will be required, meaning the application cost will increase correspondingly.

Who Develops the Mobile App

Do we have to point out that the chefs you hire matter more than the ingredients you choose for the dish? Amateurs at the development "stove" or a mess in the team’s work can ruin even the finest mobile app idea.

In any event, you'd want experienced mobile developers to work on bringing your application to life. But the cost gap when choosing in-house development or outsourcing may surprise you.

In general, the outsourcing mobile app development cost can turn out to be cheaper and faster. Even if you compare hiring freelancers vs outsourcing, the second option may bring you better all-around results.

The reason for that is that most outsourcing providers have a well-polished developer recruitment process and efficient workflows. This allows the customer to get very quick access to a talent pool of experienced specialists who are skilled in various technologies and know how to build apps, work in a team, and communicate effectively.

The providers' rates will also differ according to:

  • their location;
  • their developers' level of expertise (Junior, Middle, Senior, or Lead);
  • how many people will work on the project;
  • which programming language you choose;
  • and other things.

For example, the developers' hourly rates in the USA are four times higher than those in Eastern Europe. So, do the math when you're in two minds about who to team up with.

Are There Any Hidden Mobile App Development Costs?

Project quotes can range from one vendor to another, depending on the work scope included in your agreement. Here are a couple of points worth keeping in mind.

What app development costs can be left out-of-scope?

Discovery Phase Inclusion

The project discovery phase takes place prior to the development of the mobile application. This is the time when you do research to validate your idea and learn more about your users, decide on the technical sides of the app, and think about how to prioritize features.

While it's probably not right to call the discovery phase a "hidden cost", the inclusion of this step in the estimate can add an additional two weeks on average. Of course, you always have the alternative to handle this part on your own, only passing the development work to a third party.

UX/UI Designs

On a similar note, do you have ready mobile application designs? If your UX/UI designer has already completed this chunk of work, and you have wireframes, mockups, and clickable prototypes to provide developers, great.

If not, then your development team composition has to be fitted with at least one designer, and you'll extend the project timeframe for about a month for designing the app. Naturally, crafting the design adds to the overall app design cost, which becomes a significant factor in the total expense of creating an app.

Extra Charges and Fees

Though you might agree with the vendor on the scope of integrations and external plugins to be linked up to your app, this won't include the fees you need to pay for the tools, SaaS, etc.

For example, you'll be charged for using payment gateways like Stripe, as well as for the server, hosting, and any other parts that are necessary for the application. Clearly, marketing expenses (such as what you'll spend on running ads or email marketing) won't be part of the costs to create an app either.  

Post-Launch App Maintenance

Once your mobile application gets released, it'll need support. There'll still be lots of room for improvement after the full product or MVP launch. To say the least, you'll need someone to maintain the app and make sure it's running smoothly.

Most likely, such work as extra testing, bug fixing, optimizing code, app updating, and adding new features will be left out of scope. Typically, continuous app maintenance can cost about 15-20% of the overall development cost.

Aren't sure about the costs of making an app?

Reach out to Upsilon to discuss your project and get a quote.

Book a consultation

Aren't sure about the costs of making an app?

Reach out to Upsilon to discuss your project and get a quote.

Book a consultation

How to Reduce the App Development Cost [9 Tips]

When asking 'How much money does it cost to develop an app?', it's important to remember that the final price tag depends on a variety of factors. These include the complexity of the app, the choice of development team, and the technologies used. 

However, there are numerous strategies you can implement to reduce costs without sacrificing quality. Let's take a closer look at some practical and effective ways to lower the cost of app development.

1. Establish Clear Goals from the Start

Before diving into development, it's essential to ensure you have a clear and well-defined scope for your app. This way, you'll be able to avoid scope creep, where additional features or changes are added during the development process. A defined MVP scope leads to a more streamlined development phase, reducing unnecessary work and, in turn, the overall cost. Avoiding changes mid-project will save both time and money.

2. Focus on Core Features First

When evaluating how much does app development cost for your case, it's important to prioritize the features you really need. Rather than trying to build everything at once, focus on developing the most essential functionalities for the initial launch. Building a minimal viable product (MVP) lets you enter the market faster, reduce upfront costs, and gather user feedback to improve the app over time.

3. Build a Strong Development Team

Selecting the right development team is one of the most important decisions for reducing costs over the long term. A skilled team with experience in building similar apps will deliver faster, more efficient results. They'll avoid costly product development and MVP mistakes, minimize the need for revisions, and maximize the use of resources, ultimately keeping your project on track and within budget.

4. Consider Outsourcing for Cost Savings

Outsourcing some or all of your app development can be a smart way to reduce costs. By partnering with offshore developers, especially those in regions with lower labor costs, you can maintain high-quality results without exceeding your budget.

Choosing the right outsourcing partner ensures that you get the best value for your investment while keeping expenses under control. But as long as the partner meets your vendor evaluation criteria, this collaboration type will likely be more cost-effective and quickук than assembling a team to hire internally.

5. Take Advantage of Open-Source Resources

Open-source tools and technologies are often free, meaning you won't have to pay for expensive licensing or proprietary software. By integrating open-source libraries and frameworks, you can build a powerful app while keeping your development costs low, all without sacrificing quality.

6. Utilize Efficient Development Tools

There is a huge variety of modern app development tools, frameworks, and third-party integrations that can speed up the process and cut costs. These tools offer pre-built templates, simplified code management, and reusable components, which help reduce the amount of custom development required. By leveraging these resources, you can streamline your development efforts and lower expenses without compromising the final product.

7. Test Consistently Throughout the Process

Regular testing can save you significant amounts of money during development. By identifying bugs and issues early on, you can avoid costly fixes down the line. Testing throughout the process helps streamline the workflow, ensures a smoother development cycle, and results in a higher-quality product at a lower cost.

8. Prioritize User Experience

Investing in an exceptional user experience (UX) right from early MVP design can actually save money in the long run. While it might seem like an added cost initially, a well-designed app that is easy and enjoyable to use will lead to higher user retention and engagement. Focusing on UX will reduce churn and improve app ratings, both of which can increase revenue and long-term success.

9. Adopt Agile Development Practices

By using agile development methodologies, you can keep your app development process flexible and cost-effective. Agile breaks down the project into smaller, manageable chunks, allowing for continuous adjustments based on real-time feedback. This iterative approach minimizes risk, ensures that the app stays aligned with user needs, and ultimately reduces the overall development cost.

Mobile App Development Cost Estimation and Timeline

As you see, there are plenty of variables. Therefore, we'd like to give a sample mobile application development project timeline with possible phases to show you why the estimates can differ from project to project.

In general, building a mobile application can take from 2 months to several years. Yes, we aren't kidding! What you include in the product development roadmap, your requirements, and the number of people onboard will determine the overall delivery timeframes and cost.

Sample mobile app development project timeline

It's up to you whether you include the project discovery stage or not, but if you do, it can take at least two weeks. This pre-MVP step is often not included in the mobile app development cost estimate.

Moving further, it makes sense to split the actual mobile application development into several stages. As a rule, most projects start with a minimum viable product. This means that you first create a small but functioning version of the product with a basic feature set and then proceed with adding additional or more intricate features during the after-MVP stage. For example, the MVP version will exclude sophisticated features such as chatbots or multi-language support.

Breaking down the central MVP part of the timeline above, the development of the first version of the mobile application can take 2 months and up on average. For instance, the designer will need about two weeks to craft the app or MVP designs, while a team of 2 or 3 developers will need from a month or more to put together a functioning application. Surely, the app needs to be glitch-free before release, so about a week or so is needed for the QA testing part and bug fixes. This central timeline block is what's usually added in the app development cost quotes from vendors.

What happens next? After you release the simple MVP version of the mobile application, you'll need at least one part-time QA tester and one part-time developer for after-MVP app release support. This can be an ongoing task that'll take one month or more. Oftentimes, this is not included in the initial vendor quotes, so you'll likely be charged separately for such services.

And how much does it cost to make an app if you have more features in mind? You can consider expanding the team to help you develop the second-tier scope of mobile features for your application in the after-MVP stage. Here, the pricing and timeframes will depend on the quantity and complexity of the features, as well as the team size. Based on what you're building, we can go anywhere from one month to a couple of years. So, in any event, think of this as a separate payment.

How Much Does It Cost to Develop a Mobile App with Upsilon?

To give you a more accurate project estimate, we decided to break down what we include in the pricing. Upsilon has years of experience in building custom mobile applications.

If a client entrusts us to handle the discovery phase, which typically takes 2 weeks, we usually calculate it as a separate quote. The price for discovery is about $6,000 USD and includes the part-time hours of a UX Designer, Product Manager, and Lead Developer.

What's for mobile app design, development, testing, and launch, we work in sprints. Each sprint takes ten business days to complete, and we deliver tangible results after each such block.

How much does it cost to make an app with us? Well, depending on the team size, we can provide the following price breakdown.

Let's assume we're building a simple rent mobile application for putting up ads for apartments and houses. If we're talking about React Native development services, this can be a hybrid application fitted with a standard minimal set of features like:

  • user login/sign-in (e.g., with sign-in via social media and email);
  • the main functionality for placing ads (creating an ad with a description, address, photos, etc.);
  • the main functionality for displaying ads in the feed;
  • payment system integration;
  • basic data safety compliance features.
Mobile app development with a small team at Upsilon

Such a mobile app MVP can take from 3 or 4 to 7 sprints to develop on average. Based on Upsilon's dedicated team pricing, such a project can cost an estimated $36,000 - $84,000 USD for a small team working on the project: 

  • 1 UX/UI Designer (full-time)
  • 1 Senior Mobile Front-end Developer (full-time)
  • 1 Middle Mobile Back-end Developer (full-time)
  • 1 QA Engineer (part-time)
  • 1 Product Manager (part-time)

What's for after-release app maintenance, you can consider leaving one QA Engineer and one developer part-time to keep an eye on the app and make ongoing bug fixes and improvements. If you'd like to develop several small additional features, then maybe one or two full-time developers will be enough. This kind of work can also be put in sprints and calculated individually. You may also use our MVP cost calculator for your project estimate.

As regards the case when you'd like to scale the MVP and drastically expand the app's functionality, you can consider switching to the mid-sized team sprint-based model that offers more developers who can work on bringing additional and more intricate functionality to life. These services will come at an extra mobile app development cost. Alternatively, you can opt for the staff augmentation pricing model to assemble a team composition that'll suit your needs.

Looking for a reliable tech partner to build your mobile app?

Upsilon has ample experience in mobile app development, and our expert team is here to help!

Let's talk

Looking for a reliable tech partner to build your mobile app?

Upsilon has ample experience in mobile app development, and our expert team is here to help!

Let's talk

Final Thoughts on the Cost of Building a Mobile App

So, how much does it cost to develop an app, and how long can it take? It's never easy to give an exact price estimate in the mobile app creation scenario, as so many things influence the final price. Both the app development costs and the timeframes will totally depend on the features you choose, how complicated and large the app is, and who brings it to life.

In most cases, it is reasonable to break down the mobile application development process into phases, separating MVP creation from the rest of the post-release work. Upsilon's experienced developers provide MVP development services for startups as well as growth-stage businesses that wish to scale their products. We're agile, work in sprints, and have built numerous mobile app development products that have grown to become a success!

And as a bonus point, because many companies at an early stage often search for discounts, it is worth mentioning that Upsilon also provides the option of applying for a discount for our tech services. The Tech for Equity model implies that you can get a reduced price for developing your mobile application in exchange for your startup's shares. So, if you'd like to get a consultation or quote, feel free to contact us to discuss your project!

FAQ

1. How much money does it cost to make an app?

The cost of app development can vary widely depending on factors such as complexity, features, platform, and the development team you choose. On average, developing a simple app may cost anywhere from $10,000 to $50,000, while more complex apps can range from $100,000 to several hundred thousand dollars.

2. How much does it cost to build a mobile app?

The mobile app development cost breakdown is determined by the app's complexity, features, and development timeline. For a simple app, the mobile app creation cost could span from $30,000 to $70,000, while a more complex app might cost between $70,000 and $180,000, with highly intricate apps reaching $300,000 or more.

3. How much does it cost to make an app for your business?

The cost of mobile app development for your business relies on the app's functionality and design requirements. A basic app could cost anywhere from $30,000 to $70,000, while more feature-rich apps typically stretch between $70,000 and $180,000. For a highly complex app, the cost can exceed $300,000.

4. How much does it cost to develop an AI app?

The cost of developing an AI app is greatly shaped by the complexity of the AI features and the development timeline. A simple AI-powered app might cost between $50,000 and $100,000, while more advanced AI apps with sophisticated functionalities could start from $150,000 and go up to $300,000 or higher.

5. What's the average cost of building an app?

The app development cost breakdown can vary significantly based on its features and complexity. A simple app usually costs between $30,000 and $70,000, while more complex apps can fall within $70,000 to $180,000. For highly advanced apps, the cost can go upwards of $300,000.

No items found.
No items found.
scroll
to top

Read Next

AI Team Structure: Roles, Responsibilities, and Size from MVP to Scale
AI

AI Team Structure: Roles, Responsibilities, and Size from MVP to Scale

14 min
SaaS Authentication: How to Choose and Build Login, SSO and User Roles
Product development

SaaS Authentication: How to Choose and Build Login, SSO and User Roles

15 min
AI Agent Use Cases: Where Agents Drive Business Transformation in 2026
AI

AI Agent Use Cases: Where Agents Drive Business Transformation in 2026

14 min